
MT-PZ is a powder coating primer containing zinc which is designed to give enhanced corrosion protection of mild steel. This duplex system combines cathodic protection and barrier effect. Dedicated to steel protection with a surface pre-treatment obtained by grit/shot. MT-PZ is based on a specific epoxy zinc rich formulation that brings conductivity to enable the cathodic protection. MT-PZ includes a specific anticorrosive function which improves the protection in case of scratch.
| Хімічны тып | Thermosetting epoxy |
| Знешні выгляд | Гладкая |
| колер | шэры |
| Recommended Film Thickness (µm) | 70 - 120 мкм |
| Шчыльнасць (г / cm3) | 2.9 ± 0.03 г/см³ |
| дадатак | Электрастатычны |
| захоўванне | Under dry, cool (≤ 30°C) conditions |
| тэрмін прыдатнасці | At least 12 months from production date |
Surface preparation depends upon the metal, the type of surface, its conditions and the required performance. See our recommendation for pretreatment to be used with MT- PZ.
| Падкладка | Mechanical pretreatment | Chemical pretreatment |
| мяккая сталь | Grit Blasting Sa 2.5 in accordance with ISO NF EN 8501-1. Roughness: Rz 35 60 µm / Ra 6-12 µm | Забаронены |
| Літая сталь | ||
| Electro Zinc steel | Забаронены | |
| Гарачая ацынкаваная сталь | ||
| Zinc sprayed (gas flame/electrical deposition) |
MT-PZ is suitable for corona electrostatic spraying. Tribo application is not recommended.
| Налады прыкладання | Fluidizing air pressure: 1.5kg/cm2 initially then 1kg/cm2 Transport air pressure: 0.5 to 0.8 kg/cm Recommended voltage: 65 to 70kV |
| Curing limits | Primer should be cured, or at least gelled, using the recommended curing schedules, before application of the topcoat. The object temperature must not be below 110°C or above 180°C. The primer should be cured in a convection oven, optionally with infra-red heaters, with air temperature not exceeding 180°C. |
| Рэкамендаваная таўшчыня плёнкі | 70-120 µm A good protection is linked with the recommended film thickness. |
| Утылізацыя | Trials, with suitable recycling equipment, must be carried out before commencing production. Attention should be paid to the ratio of new powder, a minimum of 70% must be used. Gun nozzles must be cleaned every 30 minutes. |
For help with solutions customized to your business needs, contact Export Director now.
Export Director
With 20+ years of experience and We firmly believe that product quality is the basis of cooperation.
Send InquiryTEl
+86-21-6420 0566
